Phoebe 7th Floor Covid ICU

Pellicano Construction > Healthcare > Phoebe 7th Floor Covid ICU
HealthcareRenovations

Phoebe 7th Floor Covid ICU

Renovations to the 7th Floor of the “T” Wing included creating 10 private COVID ICU rooms in the 9,200 sq. ft. footprint.  Each room was designed with duplicate med-gas connections to allow each unit to run a ventilator and a dialysis machine.  The large rooms allow for a family seating/sleeping area and each room has a private toilet room with a handwash sink.  The entire suite is fed by a state-of-the-art energy-saving HVAC system that includes a dedicated exhaust unit that transfers tempered exhaust air back to the rooftop air handler via a glycol loop.  Other areas in this suite include a new Nurse’s Station, Med Room, Clean Supply Room, Soiled Utility Room, & office space for the Unit Director and Doctor’s Dictation area.