DESCRIPTION Pellicano Construction completed the 60,000 square foot manufacturing facility for John Deere Flint Power System Engine Distributors. We contracted with the owner under a design/build [...]
DESCRIPTION The expansion required the existing space to double in size to house two additional 1200 ton units. The existing energy plant consisted of 6,975 square feet with an addition of 6,523 [...]
DESCRIPTION The Smith Distribution Facility located in Valdosta, Georgia is comprised of 109,440 square feet. Pellicano contracted with the owner under a design/build cost, plus a fee with a GMP [...]